Site Logo
My Account | Wishlist | Basket
All Categories
Electric Motors

Motor Drives

  1. Home
  2. Electric Motors
  3. Motor Drives
50mm Stroke 10mm Precision Linear Stepper Electronic Starter DC 5V 2-Phase 4-Wire Stepping Electronic Starter Long Lead Screw Rod Slider Moving Nut Motor Drivers

50mm Stroke 10mm Precision Linear Stepper Electronic Starter DC 5V 2-Phase 4-Wire Stepping Electronic Starter Long Lead Screw Rod Slider Moving Nut Motor Drivers

$22.67

Product Reviews

Name: Review:

Related Products

10mm Stepper Electronic Starter DC 5V 2-phasse 4-Wires Step Electronic Starter Engine Precision Long Linear Lead 50mm Stroke Screw Nut Slider Motor Drivers

10mm Stepper Electronic Starter DC 5V 2-phasse 4-Wires Step Electronic Starter Engine Precision Long Linear Lead 50mm Stroke Screw Nut Slider Motor Drivers

$22.67

50mm Stroke Precision Copper Screw Linear 10MM Stepper Electronic Starter DC 5-9V Drive 2-Phase 4-Wire Linear Actuator Motor Drivers

50mm Stroke Precision Copper Screw Linear 10MM Stepper Electronic Starter DC 5-9V Drive 2-Phase 4-Wire Linear Actuator Motor Drivers

$32.59

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(10mm with Controller)

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(10mm with Controller)

$309.72

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(Only Motor 10mm)

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(Only Motor 10mm)

$296.70

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(10mm with Controller)

Mini Electric Telescopic Motor Diameter 9mm 30N 3mm/s 6V Stroke 10mm 20mm 30mm(10mm with Controller)

$150.64

Through-Hole Slip Ring | Circuits: 48; Bore: 50mm; 360° rotation; Precision; Hollow shaft(Solid-2 way 10A)

Through-Hole Slip Ring | Circuits: 48; Bore: 50mm; 360° rotation; Precision; Hollow shaft(Solid-2 way 10A)

$49.23

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buymotors.net 2026

Have you checked out
Today's Deals?
See Deals