Site Logo
My Account | Wishlist | Basket
All Categories
Electric Motors

Motor Drives

See More
VRTYARUPF
Electric Motors - Motor Drives

  1. Home
  2. Electric Motors
  3. Motor Drives
Product Image

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Electronic Starter Long Lead Shaft Rod Motor Drivers

$22.67

Product Reviews

Name: Review:

Related Products

10mm DC 5V 2-Phases 4-Wires Stepper Electronic Starter 23mm Stroke Long Linear Actuator Telescopic Screw Shaft Nut Motor Drivers

10mm DC 5V 2-Phases 4-Wires Stepper Electronic Starter 23mm Stroke Long Linear Actuator Telescopic Screw Shaft Nut Motor Drivers

$22.67

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Electronic Starter Long Lead Linear Screw Shaft Rod Motor Drivers

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Electronic Starter Long Lead Linear Screw Shaft Rod Motor Drivers

$22.67

N30 Metal Gear Electronic Starter 12mm*10mm DC 5V 6V 60RPM Slow Speed Large Torque Reducer Gearbox Long Shafrt Robot Car Motor Drivers

N30 Metal Gear Electronic Starter 12mm*10mm DC 5V 6V 60RPM Slow Speed Large Torque Reducer Gearbox Long Shafrt Robot Car Motor Drivers

$22.67

10mm DC 5V 2-Phases 4-Wires Precision Stepper Electronic Starter Long Linear Actuator Telescopic Screw Shaft Block Nut 23mm Stroke DIY

10mm DC 5V 2-Phases 4-Wires Precision Stepper Electronic Starter Long Linear Actuator Telescopic Screw Shaft Block Nut 23mm Stroke DIY

$43.16

35BYJ46 DC 5V 12V 300 Ohms 24V Step Permanent Magnet Gear Motor Small Stepper Motor Repair Parts - (Speed(RPM): 10MM Shaft/Voltage(V): 12V 130 Ohms)

35BYJ46 DC 5V 12V 300 Ohms 24V Step Permanent Magnet Gear Motor Small Stepper Motor Repair Parts - (Speed(RPM): 10MM Shaft/Voltage(V): 12V 130 Ohms)

$21.90

GM1024-10BY 10mm Gear Stepper Electronic Starter 2-Phase 4-Wire Stepping Electronic Starter Full Metal Radio 100_DC 5V Motor Drivers

GM1024-10BY 10mm Gear Stepper Electronic Starter 2-Phase 4-Wire Stepping Electronic Starter Full Metal Radio 100_DC 5V Motor Drivers

$21.26

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buymotors.net 2026